BY: TRAFFIC CENTER | BocaNewsNow.com
BOCA RATON, FL (BocaNewsNow.com) (Copyright © 2024 MetroDesk Media, LLC) — If it’s Sunday, it’s time for the update from the Florida Department of Transportation. This week — like so many others — is going to be difficult for motorists on the roads of Boca Raton, Delray Beach, Boynton Beach, and throughout Palm Beach County. Here is the official report from FDOT:
Palm Beach County traffic will be affected this week by ongoing construction projects and maintenance work, Florida Department of Transportation (FDOT) officials report. Closures will be in effect on I-95 and in other areas throughout Palm Beach County for construction activities. Please note, that any full road, ramp, or bridge closures have been highlighted below.
For around-the-clock, real-time, traffic information, visit www.fl511.com. To view real-time video of I-95 in Palm Beach County, visit the Florida Department of Transportation’s Palm Beach SMART SunGuide Transportation Management Center (TMC) website at www.smartsunguide.com. FDOT and the SunGuide™ Partners provide these free services. For updated lane closure information, please refer to www.d4fdot.com. Follow us on X and Instagram @MyFDOT_SEFL, and Facebook @MyFDOTSEFL.
CONSTRUCTION PROJECTS
INTERSTATE 95
- I-95 from south of Glades Road to south of Linton Boulevard and SR 808/Glades Road from NW 22nd Way to West University Drive in the Cities of Boca Raton and Delray Beach (95 Express Phase 3B-2)
Description: 95 Express Lanes Phase 3B-2 will extend the existing Express Lanes north from just south of Glades Road to just south of Linton Boulevard in Palm Beach County. One lane will be added, and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction. The number of General Use lanes will remain the same. Access to the Express Lanes will be provided via two designated ingress and egress locations—between Glades Road and Congress Avenue. The scope of work includes reconfiguration of the SR 808/Glades Road Interchange to a Diverging Diamond Interchange (DDI). Additional project improvements include overhead sign structure installation, Intelligent Transportation System (ITS) and Express Lane markers, new signalization, lighting, signing and pavement markings, and ramp signalization at five interchanges from Glades Road to Linton Boulevard. Shoulder-mounted sound barrier walls will be constructed along I-95 northbound between Clint Moore Road and Linton Boulevard, ground-mounted sound walls will be installed on the south side of Yamato Road east of I-95 adjacent to the University Heights Community and along I-95 northbound south of Linton Boulevard adjacent to the Tierra Verde Community. The Clint Moore Road Bridge over I-95 will be fully reconstructed and the Glades Road bridge over the South Florida Regional Transportation Authority (SFRTA) railroad tracks and Military Trail and the I-95 bridge over the C-15 Canal (between Peninsula Drive and Linton Boulevard) will be widened. For more information, please contact I-95 Community Outreach Manager Andrea Pacini at (561) 214-3358 or apacini@corradino.com.
Cost/Completion: $148 million. Completion is expected in early 2024.
I-95 Traffic Impact:
- No restrictions anticipated.
- Belvedere Road Improvements at the I-95 Northbound On/Off-Ramp Connection
Description: Project improvements consist of adding a second right-turn lane on the SR 9/I-95 northbound exit ramp to eastbound Belvedere Road, widening, milling, resurfacing and adding a paved shoulder to the existing SR 9/I-95 northbound exit ramp to Belvedere Road, installing new mast arms assemblies and pedestrian countdown signals, implementing a Wrong Way Driving Countermeasure System, Intelligent Transportation System (ITS) upgrades, new sidewalk construction on the south side of Belvedere Road from the exit ramp to eastern project limits, new signalization, lighting, curbs, gutter and drainage improvements, new fencing and sod installation. Construction began on July 27, 2023. For more information, please contact I-95 Community Outreach Manager Andrea Pacini at (561) 214-3358 or apacini@corradino.com.
Cost/Completion: $2.4 million. Completion is expected in Summer 2024.
Traffic Impact:
- The I-95 northbound entrance ramp from Belvedere Road may have one inside lane closed daily, 9:30 a.m. until 3:30 p.m., Monday through Friday, and nightly, 9:30 p.m. until 5:30 a.m., Sunday through Thursday.
- Belvedere Road at I-95 may have one outside lane closed in each direction, daily 9:30 a.m. until 3:30 p.m., Monday through Friday, and nightly, 9:30 p.m. until 5:30 a.m., Sunday through Thursday.
- I-95 Southbound Off-Ramp to Belvedere Road
Description: This 0.5-mile project in West Palm Beach began on September 18, 2023. Improvements include widening SR 9/I-95 southbound to lengthen the off-ramp deceleration lane, installing speed feedback signs to provide drivers’ traveling speed compared to the posted speed limit, providing a High Friction Surface Treatments on the SR 9/I-95 southbound off-ramp, implementing a Wrong-Way Driving detection system, replacing impacted sign structures and upgrading pavement markings and signage.
Cost/Completion: The project cost is $2.58 million. Completion is expected Summer 2024. For more information, please contact Community Outreach Manager Andrea Pacini at (561) 214-3358 orapacini@corradino.com.
I-95 Traffic Impact:
- I-95 southbound from south of SR 704/Okeechobee Boulevard to the I-95 southbound exit ramp to Belvedere Road, may have three outside lanes closed nightly, 10 p.m. until 6 a.m., Sunday through Thursday.
Ramp Impact:
- The I-95 southbound exit ramp to Belvedere Road will be closed overnight as needed, 10 p.m. until 6 a.m., Sunday through Thursday. Motorists will be detoured to Belvedere Road via westbound SR 80/Southern Boulevard and northbound Australian Avenue.
Belvedere Road Impact:
- Belvedere Road will have one lane closed in each direction as needed, daily, 7 a.m. until 4 p.m., Monday through Friday and nightly, 9 p.m. until 6 a.m., Sunday through Thursday.
- SR 9/I-95 at SR 786/PGA Boulevard Southbound Entrance Ramps Project
Description: This 0.65-mile project in Palm Beach Gardens began on November 9, 2022. Improvements consist of reconfiguring the I-95 southbound entrance ramps at PGA Boulevard. The I-95 southbound entrance ramp from westbound PGA Boulevard to southbound I-95 will be converted from a merge lane to an additional, free-flowing lane. The I-95 southbound entrance ramp from eastbound PGA Boulevard to southbound I-95 will be reconfigured to become a merge lane. In addition, I-95 will be widened between PGA Boulevard and Burns Road, and lighting, drainage, signage and pavement markings will be upgraded. For more information, please contact Community Outreach Manager Andrea Pacini at (561) 214-3358 or apacini@corradino.com.
Cost/Completion: $9,977,382/Spring 2024
I-95 Traffic Impact:
- No impacts anticipated.
Ramp Impact:
- No impacts anticipated.
- SR 9/I-95 Northbound Off-Ramp at SR 706/Indiantown Road Improvements Project
Description: This 1.446-mile project in Jupiter began October 30, 2023. Improvements consist of milling and resurfacing the existing roadway, re-aligning the SR 9/I-95 northbound to SR 706/Indiantown Road eastbound off-ramp to a new signalized intersection, lengthening the eastbound SR 706/Indiantown Road left turn lane to northbound SR 9/I-95, widening eastbound SR 706/Indiantown Road to provide an additional through lane and a buffered bike lane in various locations from the Florida Turnpike entrance to Central Boulevard, widening westbound SR 706/Indiantown Road to provide an additional through lane and a bike lane from 67th Road North to SR 9/I-95, widening the Indiantown Road Bridge over the C-18 canal in both directions to provide an additional through lane, upgrading Wrong-Way Driving Countermeasures on the SR 9/I-95 northbound and southbound exit ramps, upgrading Digital Message Sign (DMS) structures on westbound SR 706/Indiantown Road between Island Way and 67th Road N, widening the I-95 northbound and southbound on-ramp acceleration lane, installing sidewalk along eastbound SR 706/Indiantown Road from the Florida Turnpike entrance to Island Way, upgrading curb ramps to meet Americans with Disability Act (ADA) standards, installing patterned pavement crosswalks at Central Boulevard, upgrading drainage, signage, lighting, signalization and pavement markings and upgrading Intelligent Transportation System (ITS) throughout the project corridor. For more information, please contact Community Outreach Specialist Melissa Readling at (772) 577-8803 or mreadling@corradino.com.
Cost/Completion: $17.98 million/Spring 2025
I-95 Traffic Impact:
- No impacts anticipated.
Ramp Impact:
- No ramp impacts anticipated.
Indiantown Road Impact:
- No impacts anticipated.
SOUTHERN PALM BEACH COUNTY PROJECTS
(BOCA RATON, HIGHLAND BEACH, DELRAY BEACH)
- Dynamic Envelope Marking Rail Safety Project
Description: Construction on this railroad marking project will take place at SW Tommy Clements Street, SW Silver Fox Lane, and SW Dr. Martin Luther King Jr. Drive in Indiantown, Innovation Drive in Jupiter, Aviation Road in West Palm Beach, Larrimore Road in Pahokee, Gator Boulevard/Airport Road, NW 12th Street/Osceola Street, W Canal Street, NW Avenue D, SW Avenue E/Dr. M.L.K. Jr. Boulevard W in Belle Glade, NW 1st Avenue in South Bay, and Miami Canal Road in Lake Harbor began on August 28, 2023. Work includes milling and resurfacing the pavement, installing signage, pavement markings, and sod, and performing utility adjustments. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $1.1 million/This project was Final Accepted by the Florida Department of Transportation on Tuesday, Jan. 16, 2024.
Traffic Impacts: All lanes open.
- Advanced Transportation Management System (ATMS) Project
Description: This 6-mile project from the Broward/Palm Beach County Line to SR 794/Yamato Road and SR 794/Yamato Road from SR 5/US 1 to SR 9/I-95 in the city of Boca Raton began on July 31, 2023. Work includes installing a new fiber optic network, Intelligent Transportation System (ITS) devices, including Closed-Circuit Television (CCTV) devices at eight (8) intersections on US 1 from Royal Palm Way to Spanish River Boulevard, upgrading the signal detection system, and upgrading the Advance Traffic Management System (ATMS) for compatibility with the Traffic Management Center (TMC). For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $3.6 million. Completion is expected in summer 2024.
Traffic Impacts:
- The outside northbound lane of US 1/Dixie Highway just north of Royal Palm Way will be closed from 12 p.m. until 6 p.m., Monday, Jan. 29, to install CCTV poles
- One southbound lane of SR 5/US 1 from SE 5th Street to Camino Real will be closed from 10 p.m. until 6:30 a.m., Sunday through Friday, for directional boring.
- One northbound lane of SR 5/US 1 at Royal Palm Way will be closed from 11 a.m. until 4 p.m., Sunday through Friday, to install CCTV poles.
- One northbound lane of SR 5/US 1 from Royal Palm Way to Camino Real will be closed from 11 a.m. until 4 p.m., Sunday through Friday, to install CCTV poles.
- One southbound lane of SR 5/US 1 at Mizner Boulevard will be closed from 8 p.m. until 2 p.m., Sunday through Friday, to install CCTV poles.
- SR 800/Spanish River Boulevard Over the Intracoastal Waterway (ICWW) Scour Countermeasures Project
Description: This 0.092-mile project on SR 800/Spanish River Boulevard over the Intracoastal Waterway (ICWW) in the City of Boca Raton began January 9, 2024. Work includes Installing Articulated Concrete Block (ACB) at the riverbed to protect the bridge foundations from erosion on the eastbound and westbound SR 800/Spanish River Boulevard bridges.
Cost/Completion: $2.1 million. Completion is expected in Fall 2024.
Traffic Impacts: The frontage road may have intermittent lane closures, daily as needed, 7 a.m. until 6 p.m., Monday through Friday, for survey activities. Flaggers will be on site to assist motorists.
Marine Impacts: No impacts anticipated.
CENTRAL PALM BEACH COUNTY PROJECTS
(Boynton Beach, Lake Worth Beach, Royal Palm Beach, West Palm Beach, Palm Beach)
- SR 802/Lake Worth Road at Haverhill Road Intersection Improvement Project
Description: This 0.148-mile project from 500 feet east and west of the Haverhill Road intersection and along Haverhill Road from 300 feet south to 300 feet north of the SR 802/ Lake Worth Road intersection in the City of Greenacres is anticipated to begin on February 6, 2024. Work includes milling and resurfacing the existing roadway, modifying the median to improve motorist safety, replacing the traffic signal mast arm structure located in the northeast corner of SR 802/Lake Worth Road and Haverhill Road, installing curb and gutter, sidewalk, driveways, and bus stop pads, improving pavement markings, signage, and signalization, upgrading pedestrian signals and curb ramps to meet Americans with Disabilities Act (ADA) standards. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com
Cost/Completion: $1.3 million/Summer 2024
Traffic Impacts: No impacts anticipated. Please see attached flyer for more information.
- SR 802/Lake Worth Road Improvements Project
Description: This 1.90-mile project from Raulerson Drive to Palm Beach State College Entrance/Douglas Drive in the city of Lake Worth Beach began on November 14, 2022. Work includes constructing a new exclusive right turn lane from eastbound Lake Worth Road into the Mid-County Senior Center, installing new seven-foot bike lanes with upgraded safety features, milling and resurfacing Lake Worth Road in both directions, replacing underground Palm Beach County utilities throughout the project limits, improving sidewalk and driveways on both sides of Lake Worth Road, modifying medians to improve motorist safety, improving signalized intersections and pedestrian crossings, and installing new signage, pavement markings, and lighting. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $14 million. Completion is expected in winter 2024.
Traffic Impacts:
- The outside southbound lane on Military Trail from Bowman Street to Landar Drive may be closed from 7 a.m. to 3:30 p.m., Monday through Friday, for directional bore operations.
- The outside northbound lane on Military Trail from Childs Street to Charlotte Street may be closed from 7 a.m. to 3:30 p.m., Monday through Friday, for directional bore operations.
- The outside southbound lane on Congress Avenue from 2nd Avenue N. to Palm Beach State College Entrance/ Douglas Drive may be closed from 7 a.m. to 3:30 p.m., Monday through Friday, for directional bore operations.
- The outside northbound lane on Congress Avenue from Palm Beach State College Entrance/ Douglas Drive to 2nd Avenue N. may be closed from 7 a.m. to 3:30 p.m., Monday through Friday, for directional bore operations.
- Two eastbound lanes on Lake Worth Road from Raulerson Drive to Congress Avenue may be closed from 7 a.m. to 3:30 p.m., Monday through Friday, for force main construction, median construction, and directional bore operations.
- Two westbound lanes on Lake Worth Road from Congress Avenue to Raulerson Drive may be closed from 7 a.m. to 3:30 p.m., Monday through Friday, for force main construction, median construction, and directional bore operations.
- One lane in each direction on Lake Worth Road from Raulerson Drive to Congress Avenue may be closed for median construction.
- SR 802/Lake Worth Road Roundabout Pedestrian Safety Project on Behalf of the City of Lake Worth Beach
Description: This 0.5-mile project from Erie Street to A Street/Lucerne Avenue Roundabout and Lucerne Avenue to C Street, and Lake Osborne Drive from Griswold Drive to Erie Street in the City of Lake Worth Beach is anticipated to begin on January 3, 2024. Work includes milling and resurfacing existing travel lanes, constructing a six-foot wide sidewalk along the east side of Lake Osborne Drive, installing a raised crosswalk with signalization on Lucerne Avenue just east of N B Street, upgrading pedestrian signals and curb ramps to meet Americans with Disabilities Act (ADA) standards, and upgrading lighting along Lake Worth Road. For more information, please contact Community Outreach Specialist Melissa Readling at mreadling@corradino.com or 772-577-8803.
Cost/Completion: $2.8 million/Summer 2024
Traffic Impacts:
· One outside lane in each direction of SR 802/Lake Worth Road between the railroad tracks and N. A Street may be closed 9 a.m. until 2 p.m., Monday through Friday, through Friday, Feb. 2, for clearing and grubbing and signal work.
· One outside eastbound lane of SR 802/Lake Worth Road between Cleveland Street to N. A Street (Roundabout) may be closed from 9 a.m. until 2 p.m., Monday through Friday, through Friday, Feb. 2, for clearing and grubbing and signal work.
- SR 802/Lake Avenue/Lucerne Avenue Resurfacing, Restoration, and Rehabilitation Project
Description: This 2.382-mile project from east of A Street to east of Golfview Road in the City of Lake Worth Beach is anticipated to begin on February 27, 2024. Work includes milling and resurfacing the existing roadway, replacing and upgrading signing and pavement markings, install new and upgrade existing lighting throughout the project corridor, upgrading pedestrian features at signalized intersections, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards. For more information, please contact Community Outreach Specialist Melissa Readling atmreadling@corradino.com or 772-577-8803.
Cost/Completion: $5.4 million/Early 2025
Traffic Impacts: No impacts anticipated.
Virtual Public Meeting: Thursday, February 15, 2024, on GoToWebinar from 5:00 p.m. to 5:30 p.m. and from 5:30 p.m. to 6:00 p.m. Please use the following link or QR code to register:https://bit.ly/3tkBWj9. You may also call +1 (562) 247-8422 Access Code: 420-280-653
In-Person Construction Open House: Thursday, February 15, 2024, from 6:00 p.m. to 7:00 p.m. at the Lake Worth Beach City Library, Library Meeting Room at 15 N M Street, Lake Worth Beach, FL 33460. Please see attached flyer for more information.
- 6th Avenue South Improvements at SR 9/I-95
Description: This 1-mile project in the City of Lake Worth Beach began on October 2, 2023. Project improvements consist of lengthening the turn lanes on 6th Avenue South, adding an exclusive right turn lane to the SR 9/I-95 northbound on ramp, adding an additional right turn lane to the SR 9/I-95 southbound on ramp, lengthening the northbound left turn lane at A Street, constructing 6-foot sidewalks on both sides of 6th Avenue South, constructing 7-foot bicycle lanes on both sides of 6th Avenue South, installing Wrong-Way Driving Countermeasures on the SR 9/I-95 northbound and southbound exit ramps, constructing 16-foot ground-mounted sound walls along the SR 9/I-95 northbound exit ramp and south side of 6th Avenue South, constructing new gravity wall, curb and gutter, traffic separator, median barrier, sidewalk and driveway along 6th Avenue South within project limits, upgrading drainage, signage, lighting, signalization and pavement markings, Intelligent Transportation System (ITS) upgrades, and relocation of water, sewer and utilities for the City of Lake Worth Beach.
Cost/Completion: The project cost is $17.92 million. Completion is expected in Late 2025. For more information, please contact Community Outreach Manager Andrea Pacini at (561) 214-3358 orapacini@corradino.com.
Traffic Impact:
- 6th Avenue South, from Michigan Avenue to South A Street, will have one lane closed in each direction through August 2024.
Ramp Impact:
- The I-95 southbound entrance ramp from eastbound 6th Avenue South has the right turn lane closed to safely facilitate roadway and drainage operations.
- The I-95 northbound exit ramp to eastbound 6th Avenue South has the right turn lane closed to safely facilitate roadway and drainage operations.
- The I-95 northbound exit ramp to westbound 6th Avenue South has the left turn lane closed to safely facilitate roadway and drainage operations.
- The I-95 southbound exit ramp to westbound 6th Avenue South has one right turn lane closed to safely facilitate the construction of a Mechanically Stabilized Earth (MSE) wall and roadway construction.
- SR 7/US 441 Resurfacing Project
Description: This 2-mile project in Royal Palm Beach began on August 17, 2023. The project improvements consist of milling and resurfacing the existing roadway, improving signing and pavement markings, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards, and upgrading lighting and signalization at the following intersections: Weisman Way/Bella Terra Way, Belvedere Road, Business Park Way, Regal Cinemas 18, Aldi Way, and Okeechobee Boulevard. For more information, please contact Melissa Readling at 772-577-8803 ormreadling@corradino.com.
Cost/Completion: $8 million/Fall 2024
Traffic Impacts:
- The outside northbound lane on SR 7/US 441 is closed from north of Belvedere Road to SR 704/Okeechobee Boulevard for clearing and grubbing, roadway widening, curb and gutter, sidewalk, lighting, and signalization upgrades.
- Intermittent single-lane closures will occur in each direction of SR 7/US 441 from north of SR 80/Southern Boulevard to SR 704/Okeechobee Boulevard, from 8:30 a.m. until 4:30 p.m., Monday through Friday for installation of erosion control devices, widening, sidewalk, and bus pad.
- Southern Boulevard (SR 80) Bridges Replacement Project
Description: This 0.76-mile project includes replacing the existing bascule (draw) bridge and tide relief bridge over the Intracoastal Waterway (ICWW) and Lake Worth Lagoon between the Town of Palm Beach and the City of West Palm Beach. The project limits are between Washington Road in West Palm Beach and State Road A1A/South Ocean Boulevard in Palm Beach. New decorative lighting, pedestrian features, traffic signals, signage and drainage are included. For more information, please contact Community Outreach Manager Andrea Pacini at (561) 214-3358 orapacini@corradino.com.
Cost/Completion: $97 million. Completion is anticipated in early 2024.
Traffic Impact: No impacts anticipated.
Marine Impact:
- The schedule of channel restrictions is published in the U.S. Coast Guard’s Local Notice to Mariners at www.navcen.uscg.gov. The Southern Boulevard Bridge opens for marine traffic twice per hour at 15 minutes and 45 minutes past the hour.
- SR 809/Military Trail at SR 882/Forest Hill Boulevard Intersection Improvements Project
Description: This 0.705-mile intersection improvement project on State Road 809/Military Trail and SR 882/Forest Hill Boulevard in Palm Beach County began on September 6, 2022. Work includes widening, milling, and resurfacing along SR 809/Military Trail and SR 882/Forest Hill Boulevard, constructing additional right and left turn lanes on SR 809/Military Trail and additional right turn lanes on SR 882/Forest Hill Boulevard, installing new 5-foot bike lanes at various locations along SR 882/Forest Hill Boulevard, improving sidewalks and driveways at the intersection of SR 809/Military Trail and SR 882/Forest Hill Boulevard, installing four new signal mast arms at the intersection, and installing new signage and pavement markings. For more information, please contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $7 million. Completion is expected in winter 2024.
Traffic Impact:.
- The outside eastbound and westbound lanes on Forest Hill Boulevard may be closed from Haverhill Road to Kirk Road from 7 a.m. to 5 p.m. Monday through Friday for directional bore and signalization operations.
- The outside northbound and southbound lanes on Military Trail may be closed from Summit Boulevard to Purdy Lane from 9 a.m. to 3 p.m. Monday through Friday, for directional bore and signalization operations.
- The outside southbound lane on Military Trail from Holiday Way to Forest Hill Boulevard is closed for turn lane construction.
- State Road (SR) 5/US 1 Improvements Project
Description: This 0.437-mile road improvements project on SR 5/US 1 from North Quadrille Boulevard to Palm Beach Lakes Boulevard in the City of West Palm Beach began on Thursday, September 14, 2023. Work includes milling and resurfacing the existing roadway, improving curb and gutter, signing and pavement markings, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards, and upgrading pedestrian signalization. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com
Cost/Completion: 1.2 million/Spring 2024
Traffic Impacts:
- One lane in each direction of SR 5/US 1 from Quadrille Boulevard to Palm Beach Lakes Boulevard may be closed from 9 a.m. to 4 p.m. Monday through Friday, to facilitate utility adjustments.
- A permanent northbound outside lane closure is in place along US 1/N Dixie Highway from 6th St. to 8th St. This closure is related to adjacent private development and not the FDOT construction contract.
Lane Closures Unrelated to the Project:
- A full closure will occur nightly from 8 p.m. until 6 a.m. along US 1/Dixie Highway from Quadrille Boulevard to Palm Beach Lakes Boulevard from Sunday, Jan. 28 through Thursday, Feb.1, The roadway will be open to local traffic south of 6th St. and north of 8th St. Thru traffic will be detoured along N. Olive Avenue around the closure area. This closure is related to adjacent private development and not the FDOT Construction contract.
- SR 80/Southern Boulevard Resurfacing and Bridge Rehabilitation Project
Description: This 0.73-mile project in West Palm Beach began on June 5, 2023. Improvements on Southern Boulevard between east of Parker Avenue and west of Washington Road consist of repaving the roadway and replacing the damaged sidewalk. Improvements also include adding new pavement markings and upgrading pedestrian signals, lighting, and signage. The bridge rehabilitation includes replacing the bridge deck joints, repairing the concrete traffic railing, and rehabilitating and painting the steel beams over Georgia Avenue. For more information, please contact Community Outreach Manager Andrea Pacini at (561) 214-3358 or apacini@corradino.com.
Cost/Completion: Project cost is $3.8 million. Anticipated completion is early 2024.
- SR 80/Southern Boulevard from Dixie Highway to Washington Road will have one lane closed in each direction as needed, daily, 8 a.m. until 4 p.m., Monday through Friday and nightly, 8 p.m. until 5 a.m., Sunday through Thursday.
- SR 80/Southern Boulevard from Parker Avenue to Lake Avenue will have one lane closed in each direction as needed, daily, 8 a.m. until 4 p.m., Monday through Friday and nightly, 8 p.m. until 5 a.m., Sunday through Thursday.
NORTHERN PALM BEACH COUNTY PROJECTS
(Riviera Beach, North Palm Beach, Palm Beach Gardens, Juno Beach, Jupiter, Tequesta)
- State Road (SR) 809/Military Trail Resurfacing Project
Description: This 0.63-mile resurfacing project from south of Dyer Boulevard to north of Flag Drive in Riviera Beach began on August 8, 2023. The project improvements consist of milling and resurfacing the existing roadway, reconstructing sidewalks in select locations, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards, upgrading signalization at Dyer Boulevard, SR 710/Beeline Highway/Martin Luther King Jr. Boulevard, and SR 708/W Blue Heron Boulevard, and upgrading pedestrian signals, intersection lighting, signage, and pavement markings. For more information, please contact Community Outreach Specialist Melissa Readling at mreadling@corradino.com or 772-577-8803
Cost/Completion: $2.6 Million/Summer 2024
Traffic Impacts:
- Pedestrian detours may be in place from Dyer Boulevard to Blue Heron Boulevard from 9:30 a.m. until 3:30 p.m. Monday through Friday for sidewalk work.
- One lane in each direction of SR 809/Military Trail from Dyer Boulevard to Blue Heron Boulevard may be closed nightly from 7 p.m. to 8 a.m. Monday through Friday for paving operations.
- Two lanes in each direction of SR 809/Military Trail from Dyer Boulevard to Blue Heron Boulevard may be closed nightly from 10 p.m. to 7 a.m. Monday through Friday for paving operations.
- US 1 Bridge Replacement Project
Description: This 4.1-mile project located in the Town of Jupiter from CR A1A to CR 707/Beach Road and surrounding intersections began October 18, 2021. It consists of replacing the existing US 1 Bridge over the Loxahatchee River, including adding bike lanes and sidewalks in each direction. Other improvements include installing Intelligent Transportation System technology to improve traffic flow, adding decorative lighting and drainage, and upgrading signage and pavement markings. Minor improvements will also be made to the Alternate A1A bridge over the Loxahatchee River. In addition, intersection improvements will occur at Alternate A1A and Old Dixie Highway by shifting the intersection to the southwest, adding a traffic signal, and lengthening the left-turn lane from northbound Alternate A1A to northbound Old Dixie Highway. For more information, please contact Community Outreach Manager Andrea Pacini at (561) 214-3358 or apacini@corradino.com.
Cost/Completion: $122 million/2026
Traffic Impact:
- The US 1 bridge between CR A1A and Jupiter Cove Drive will be closed through fall 2024. Traffic is being detoured as follows:
- Northbound motorists will go west on Indiantown Road to Alternate A1A, then go north on Alternate A1A to US 1.
- Southbound motorists will go south on Alternate A1A to Indiantown Road, then go east on Indiantown Road to US 1.
WESTERN PALM BEACH COUNTY PROJECTS
(Wellington, Royal Palm Beach, South Bay, Belle Glade, Pahokee, Canal Point)
- State Road 25/US 27 Safety Improvements Project
Description: Construction on this 13-mile safety improvements project began on Monday, January 3, 2022, in western Palm Beach County. Work includes widening the shoulders of the roadway, replacing, or resetting guardrails along the roadway, installing rumble strips, and internally illuminated retroreflective pavement markings along the roadway shoulders, adding a median acceleration lane and flashing beacons at the Okeelanta Road intersection, adding outside and median acceleration lanes at the County Road 827/Bolles Canal Road intersection. For more information, please contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $18 million. Completion is expected summer 2024.
Traffic Impact:
- Northbound and southbound SR 25/US 27 posted speed limits are reduced from 65 mph to 55 mph from just north of Mile Marker 71 to just south of Mile Marker 60 through the duration of the project.
- The following lanes are closed around the clock for shoulder widening activities:
- The inside northbound lane is closed from mile marker 65 to mile marker 68.
- The inside southbound lane is closed from mile marker 65 to mile marker 68.
- State Road 25/US 27 Resurfacing and Restoration Project
Description: Construction on this 13-mile resurfacing and restoration project from the Hendry County Line to SR 80/East Palm Beach Road began on Thursday, May 5, 2022, in Western Palm Beach County. Work includes milling and resurfacing existing travel lanes and shoulders, shoulder widening, replacing or resetting guardrails along the roadway, restoring sidewalks at various locations, upgrading curb ramps to meet Americans with Disabilities Act (ADA) standards, adding pedestrian gates at the FEC Railroad crossing, improving lighting and replacing the signals at SR 80/East Palm Beach Road, upgrading pedestrian signals, pavement markings, and signing to current standards, installing rumble strips and internally illuminated retroreflective pavement markings. o
For more information, please contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $18 million. Completion is expected early 2024.
Traffic Impact:
- The following lanes are closed for asphalt paving, resetting of guardrail, slope grading, and sod installation.
- One northbound lane of SR 25/US 27 from mile marker 73 to mile marker 86.
- One southbound lane of SR 25/US 27 from mile marker 73 to mile marker 86.
- State Road 715 and State Road 80 Resurfacing Project
Description: Construction on this 4.44-mile resurfacing project on SR 715 and SR 80 began on July 10, 2023, in Western Palm Beach County. Work includes milling and resurfacing the existing roadway and minor widening of existing paved shoulders, installing pedestrian signalization and markings, improving signing and pavement markings, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards, and adding new sidewalk on the west side of SR 715 and select locations on SR 80. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $12 million/Summer 2025
Traffic Impacts
- The outside westbound lane of SR 80 from SR 25/US 27 to east of Glades Glen Drive will be closed intermittently from 8:30 a.m. until 4:30 p.m., Monday through Friday. One travel lane will remain open at all times to maintain traffic. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
- SR 15/US 441/US 98 Roadway Improvements Project
Description: Construction on this 6.8-mile roadway improvements project on SR 15/US 441/US 98 in Canal Point began on October 23, 2023. Work includes milling and resurfacing the existing travel lanes, widening roadway shoulders, constructing a new sidewalk along the east side of the road from Canal Point Park and Recreation Center to Connell Road, constructing new bike lanes from Lake View Drive to Canal Point Park and Recreation Center, upgrading signing and pavement markings, replacing or resetting guardrails along the roadway, upgrading the bridge concrete barrier wall over the L-8 Canal. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com
Cost/Completion: $12.9 million/Spring 2025
Traffic Impacts:
- The southbound lane of SR 15/US 441/US 98 from the Palm Beach County Line to the north of 1st Street will be closed intermittently from 7:00 a.m. until 5 p.m., Monday through Friday through March 2024 for road construction activities. Flagging operations will be in place to direct southbound and northbound traffic as needed.
MAINTENANCE, UTILITY, PERMIT & ADDITIONAL AGENCY PROJECTS
SOUTHERN PALM BEACH COUNTY
(BOCA RATON, HIGHLAND BEACH, DELRAY BEACH)
BOCA RATON
Southbound State Road 7 at intersection of Spanish Isles Boulevard, in Boca Raton, 7 p.m. until 6 a.m., 4 nights only, Monday, Jan. 29 through Friday, Feb. 02, 2 of 2 lanes closed as needed, for milling and paving for watermain utility repair. For more information, please contact Alexander Guisinger 561-588-1170.
Northbound and Southbound Federal Highway at intersection of Northeast 20 Street, in Boca Raton, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Oct. 16 extended through Thursday, Feb. 29, 1 of 3 lanes closed, for directional boring installation. For more information, please contact Dennis Torrijos 954-235-3605.
Southbound North Federal Highway between Northeast 29 Street and Northeast 20 Street, in Boca Raton, 9 a.m. until 3:30 p.m., Monday through Friday and 9 p.m. until 3:30 a.m., Sunday through Thursday, Wednesday, Jan. 23 through Monday, Mar. 25, 1 of 2 lanes closed, for pavement restoration and water main installation. For more information, please contact Luis Hernandez 954-605-7940.
Southbound State Road 7 between Winners Circle and Yamato Road, in Boca Raton, 9 a.m. until 3:30 p.m., Monday through Friday, Friday, Sept. 01 extended through Wednesday, Mar. 13, 1 of 2 lanes closed, for handholes, locate posts and concrete aprons installation. For more information, please contact Karl Suarez 336-719-4574.
Southbound State Road 7 between Lakeridge Boulevard and New England Boulevard, in Boca Raton, 9 a.m. until 3:30 p.m., Monday through Friday, Thursday, Aug. 31 extended through Wednesday, Mar. 13, 1 of 3 lanes closed, for handholes installation. For more information, please contact Karl Suarez 336-719-4574.
HIGHLAND BEACH
Southbound South Ocean Boulevard at 3614 South Ocean Boulevard, in Highland Beach, 9 a.m. until 3 p.m., Monday through Friday, Monday, Jan. 29 through Friday, Feb. 16, 1 of 1 lanes closed as needed, for bike lane and sidewalk construction. For more information, please contact Andre Abdul 954-783-6922.
DELRAY BEACH
Northbound Federal Highway at 2725 Northbound Federal Highway, in Delray Beach, 10 a.m. until 3:30 p.m., Two days only, Monday, Jan. 29 through Tuesday, Jan. 30, 1 of 2 lanes closed, for tap existing water main. For more information, please contact Chris Vickers 954-937-5305.
Southbound North Ocean Boulevard between Thomas Street and East Atlantic Avenue, in Delray Beach, 7 p.m. until 6 a.m., Sunday through Thursday, Monday, Apr. 17 extended through Monday, Mar. 24, 2024, 1 of 2 lane closed, for directional boring and facilities maintenance. For more information, please contact Arturo Rodriguez 561-475-0064.
Westbound West Atlantic Avenue between South Congress Avenue and Northwest 41 Avenue, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, Aug. 15 extended through Monday, Feb. 19, 2024, 1 of 2 lanes closed, for pole installation and facilities maintenance. For more information, please contact Marcus Mitchell 561-837-0902.
Westbound West Atlantic Avenue at intersection of Persimmon Avenue, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Sept. 11 extended through Friday, Mar. 08, 1 of 2 lanes closed, for water main connection. For more information, please contact Felix Clavelo 305-342-5568.
Southbound State Road 7 between Bob West Road and West Atlantic Avenue, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Friday, Sept. 01 extended through Friday, Mar. 15, 1 of 2 lanes closed, for handholes, concrete aprons, marker post, and boring pit installation. For more information, please contact Karl Suarez 336-719-4574.
Southbound US Highway 1 between Atlantic Avenue and Cabernet Drive, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Thursday, Aug. 31 extended through Wednesday, Mar. 13, 1 of 2 lanes closed, for handholes, concrete aprons, marker post, and boring pit installation. For more information, please contact Karl Suarez 336-719-4574.
Westbound and Eastbound Atlantic Avenue between Half Mile Road Persimmon Avenue additionally Northbound and Southbound Lyons Road, in Delray Beach, 8 a.m. until 5 p.m., Monday, Aug. 15 extended through Friday, Jul. 31, 2024, 1 of 2 lanes closed, for signalization, underground drainage and roadway. For more information, please contact Tom Castano 561-688-5004.
Northbound Federal Highway between Bond Way and South Lake Avenue, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Nov. 27 extended through Friday, Mar. 18, 1 of 2 lanes closed, for directional boring and conduit installation. For more information, please contact Cory Adams 912-286-6949.
CENTRAL PALM BEACH COUNTY
(GULF STREAM, BOYNTON BEACH, OCEAN RIDGE, LANTANA, MANALAPAN, LAKE WORTH BEACH, WELLINGTON, GREENACRES, PALM BEACH, WEST PALM BEACH, LOXAHATCHEE, THE ACREAGE, PALM SPRINGS):
BOYNTON BEACH
Eastbound Boynton Beach Boulevard between Winchester Park Boulevard and North Congress Avenue, in Boynton Beach, 9 a.m. until 3:30 p.m. & 7 p.m. until 6 a.m., Monday through Friday, Monday, Aug. 21 extended through Thursday, Feb. 22, 2024, 1 of 3 lanes closed, for pole re-installation. For more information, please contact Cory Zartman 480-547-0294.
Eastbound Boynton Beach Boulevard between Leisureville Boulevard and Quail Covey Road, in Boynton Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Sept. 11 extended through Friday, Mar. 18, 1 of 3 lanes closed, for handholes, concrete aprons, marker post, and boring pit installation. For more information, please contact Karl Suarez 336-719-4574.
Southbound State Road 7 between Boynton beach Boulevard and Atlantic Avenue, in Boynton Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Thursday, Sept. 07 extended through Friday, Mar. 08, 2024, 1 of 2 lanes closed, handholes, concrete aprons, marker post, and boring pit installation. For more information, please contact Karl Suarez 336-719-4574.
LAKE WORTH BEACH
Northbound and Southbound North Federal Highway between Maryland Drive and Arlington Road, in Lake Worth Beach, 9 a.m. until 4 p.m., One day only, Monday, Jan.
29, 1 of 2 lanes closed for bridge maintenance. For more information, please contact Mark Donati 954-955-0878.
Eastbound and Westbound Lake Avenue Bridge between N. Golfview Road and S. Ocean Boulevard, in Lake Worth Beach, 9 a.m. until 4 p.m. Tuesday, Jan. 30 to Friday, Feb. 2, 1 of 2 lanes closed for bridge maintenance. For more information, please contact Mark Donati 954-955-0878.
Northbound South Federal Highway at the intersection of Miner Road, in Lake Worth, 9 a.m. until 4 p.m., Monday through Friday, Thursday, Jan. 11 through Friday, Feb. 09, 1 of 2 lanes closed, for directional boring and conduit installation. For more information, please contact Dennis Torrijos 954-235-3605.
WEST PALM BEACH
Northbound South Dixie Highway between Sophia Drive and Jefferson Road, in West Palm Beach, 4 p.m. until 12 a.m., Sunday through Thursday, Saturday, Jan. 20 through Tuesday, Feb. 06, 2 of 2 lanes closed as needed, for sanitary line demolition. For more information, please contact Chris Vickers 954-937-5305.
Southbound and Northbound US Highway A1A between Eucalyptus Street and 8 Street, in West Palm Beach, 7 p.m. until 6 a.m., Four nights only, Sunday, Jan. 28 through Thursday, Feb. 01, 2 of 2 lanes closed as needed, for sanitary line demolition. For more information, please contact Roosevelt Bynes III 954-321-8205.
Southbound Broadway between West 34 Street and 59 Street, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Jan. 29 through Friday, Apr. 19, 1 of 2 lanes closed, for directional boring and hand hold installation. For more information, please contact Jay Fisher 561-268-6828.
Northbound and Southbound South Military Trail between Lake Worth Road and Clemens Street, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Wednesday, Jan. 03extended through Friday, Mar. 29, 1 of 3 lanes closed, for pole replacements and facilities maintenance. For more information, please contact Phillip Keene 563-558-5445.
Northbound South Military Trail between Lake Worth Road and 10 Avenue North, in West Palm Beach, 8:30 p.m. until 6 a.m., Monday through Friday, Tuesday, Jan. 16 through Friday, Mar. 29, 2 of 3 lanes closed, for concrete poles changing. For more information, please contact John Scott 239-340-8695.
Westbound Southern Boulevard between Royal Plaza Road and A Road, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, Nov. 28 extended through Monday, Apr. 01,1 of 3 lanes closed, for directional boring, handholes, marker posts and boring pits installation. For more information, please contact Kyle Aslop 336-719-4879.
Southbound South Military Trail between Mediterranean Road and 10 Avenue North, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Wednesday, Jan. 31 through Monday, Mar. 18, 1 of 3 lanes closed, for directional boring and conduit installation. For more information, please contact Cory Adams 912-286-6949.
Southbound Bee Line Highway between Park of Commerce Boulevard and PGA Boulevard, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, Nov. 28 extended through Monday, Apr. 01, 1 of 3 lanes closed, for directional boring, handholes, marker posts and boring pits installation. For more information, please contact Kyle Aslop 336-719-4879.
Northbound Federal Highway between Gregory Road and West Summa Street, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, Apr. 18 extended through Wednesday, Mar. 13, 1 of 2 lane closed, for directional boring and facilities maintenance. For more information, please contact Matthew Petrillo 954-621-8184.
Southbound South Military Trail between Sunny Lane Avenue and Summit Boulevard, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, Aug. 29 extended through Wednesday, Mar. 13, 1 of 3 lanes closed, for handholes, concrete aprons, marker post, and boring pit installation. For more information, please contact Karl Suarez 336-719-4574.
Eastbound Royal Park Way between SR 5/US 1 and South County Road, over the Royal Park Bridge,9 a.m. until 5 p.m., Tuesday, Jan. 30 with contingency date of Wednesday, Jan. 31, 1 of 2 lanes closed for bridge maintenance. For more information, please contact Mark Donati at (954)-955-0878.
Southbound South Dixie Highway between Belvedere Road and Southern Boulevard, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Jan. 22 through Friday, Mar. 08, 1 of 2 lanes closed, for directional boring and handhole installation. For more information, please contact Jay Fisher 561-268-6828.
Westbound Bee Line Highway at the intersection of Park of Commerce Boulevard, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Wednesday, Jan. 17 through Friday, Mar. 15, 1 of 2 lanes closed, for median asphalt work and turning lane installation. For more information, please contact Roosevelt Bynes III 954-321-8205.
Northbound and Southbound Quadrille Boulevard at the intersection of Clematis Street, in West Palm Beach, 8 p.m. until 4:30 a.m., Sunday through Thursday, Monday, Jan. 22 through Thursday, Feb. 01, 1 of 1 lanes closed as needed, for crosswalk Striping and installation. For more information, please contact Isaac Cross 954-933-1758.
Eastbound and Westbound Okeechobee Boulevard between mile post 3.368 and mile post 3.839, in West Palm Beach, 9 p.m. until 6 a.m., Sunday through Thursday, Monday, Jan. 22 through Thursday, Feb. 01, 2 of 3 lanes closed, for soil testing. For more information, please contact Marc Novak 813-989-1354.
Southbound US Highway A1A between Villa Juno Drive and Ridge Road, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Thursday, Oct. 19 extended through Tuesday, Feb. 20, 2024, 1 of 3 lanes closed, for pole and handhole installation. For more information, please contact Arturo Rodriguez 561-475-0064.
Southbound US Highway A1A between Villa Juno Drive and Universe Boulevard, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Thursday, Oct. 26 extended through Tuesday, Mar. 12, 1 of 2 lanes closed, for directional boring, conduit and optic cable installation. For more information, please contact Karl Suarez 336-719-4574.
Southbound North Military Trail between Canterbury Drive North and Upthegrove Lane, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Friday, Aug. 18 extended through Wednesday, Mar. 13, 1 of 3 lanes closed, for directional boring installation. For more information, please contact Cory Adams 912-286-6949.
Eastbound Forest Hill Boulevard between Ferngran Avenue and South Haverhill Road, in West Palm Beach, 9 am -3:30 pm, Monday through Friday, Monday, Dec. 12 through Monday, Feb. 12, 2024, 1 of 3 lanes closed, for handholes, directional boring, utility pole, antenna and small cell installation. For more information, please contact Urma Charlemagne 561-418-0598.
Westbound Okeechobee Boulevard between North Jog Road and Andros Isle, in West Palm Beach, 9 am – 3:30 pm, Monday through Friday, Friday, Dec. 15 through Thursday, Feb. 15, 2024, 1 of 4 lanes closed, for guy anchors and bonds installation. For more information, please contact Kyle Aslop 336-719-4879
Westbound and Eastbound Okeechobee Boulevard between Tallahassee Drive and Indian Road, in West Palm Beach, 9 p.m. until 5 a.m., Sunday through Thursday, Sunday, Dec. 03 through Thursday, Feb. 08, 2024,2 of 3 lanes closed as needed, for utility pole, antenna, mounting bracket installation. For more information, please contact Urma Charlemagne 561-418-0598.
Eastbound Southern Boulevard between East Canal Street South and Seminole Pratt Whitney Road, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, Nov. 28 through Monday, Jan. 29, 2024, 1 of 3 lanes closed, for directional boring, handholes, marker posts and boring pits installation. For more information, please contact Kyle Aslop 336-719-4879.
Southbound State Road 7 between Bella Terra Way and Victoria Groves Boulevard, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Sept. 11 extended through Friday, Mar. 18, 1 of 4 lanes closed, for handholes, concrete aprons, marker post, and boring pit installation. For more information, please contact Karl Suarez 336-719-4574.
Northbound South Military Trail between Gardenette Street and Gun Club Road, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Aug. 28 extended through Wednesday, Mar. 13, 1 of 3 lanes closed, for handholes, concrete aprons, marker post, and boring pit installation. For more information, please contact Karl Suarez 336-719-4574.
Northbound North Military Trail between Okeechobee Boulevard and Keiser University Drive, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday AND 9 p.m. until 3:30 a.m., Sunday through Thursday, Monday, Oct. 30 extended through Wednesday, Mar. 13, 1 of 3 lanes closed, for pole installation. For more information, please contact Cory Zartman 480-547-0294.
Southbound State Road 7 between Lantana Road and Hypoluxo Road, in West Palm Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Oct. 23 extended through Wednesday, Mar. 13, 1 of 3 lanes closed, for pole replacement. For more information, please contact Arturo Rodriguez 561-475-0064.
Northbound North Military Trail between Woodstock Drive and Windsor Way, in West Palm Beach 9 a.m. until 3:30 p.m., Monday through Friday AND 9 p.m. until 3:30 a.m., Sunday through Thursday, Wednesday, Nov. 01 extended through Friday, Mar. 15, 1 of 3 lanes closed, for pole installation. For more information, please contact Arturo Rodriguez 561-475-0064.
PALM SPRINGS
Northbound and Southbound South Congress Avenue between 10 Avenue North and Buckley Avenue, in Palm Springs, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, May 22 extended through Friday, Mar. 29, 1 of 3 lanes closed, for pole removal and installation. For more information, please contact Michael Garson 954-774-0814.
Southbound South Congress Avenue just North of Rex Avenue, in Palm Springs, 9 a.m. until 4 p.m., Monday through Friday, Wednesday, Jan. 31 through Friday, Feb. 09, 1 of 3 lanes closed, for milling and paving. For more information, please contact Paige Weeks 561-793-9400.