Boca Raton. Delray Beach. Boynton Beach. Wellington. West Palm Beach. Lake Worth. Palm Beach County Traffic.

BOCA RATON, FL (BocaNewsNow.com) (Copyright © 2026 MetroDesk Media, LLC) — The Florida Department of Transportation (FDOT) has released an extensive list of construction and maintenance projects set to impact Palm Beach County commuters from Jan. 30 through Feb. 6, 2026. Drivers should prepare for lane closures, shifts in traffic patterns, and detours across the region. Fasten your seatbelt, here we go…
Interstate 95 and Major Interchanges
- Boynton Beach Boulevard Interchange Improvements: Lane closures in each direction on Boynton Beach Boulevard are scheduled from 9 p.m. to 6 a.m., Sunday through Saturday. I-95 itself may see up to three lanes closed nightly (10 p.m. – 6 a.m.) between Sunday and Thursday.
- I-95 Ramp Closures at Boynton Beach Blvd: Full nightly closures (9 p.m. – 6 a.m.) may affect the northbound exit, southbound exit, northbound entrance, and southbound entrance ramps on a rotating basis. Detours involve Woolbright Road, Gateway Boulevard, U.S. 1, and Congress Avenue.
- Safety Improvements: Work on ramps at Okeechobee Boulevard, PGA Boulevard, and Indiantown Road involves high-friction surfacing and LED lighting upgrades, though no ramp closures are currently scheduled.
Southern Palm Beach County (Boca Raton, Delray Beach)
- U.S. 441/S.R. 7 (Boca Raton): Intermittent outside lane closures in both directions between Bridge Brook Drive and West Boca Plaza occur weekdays from 9 a.m. to 4 p.m..
- S.R. A1A (Delray Beach/Highland Beach): One lane in each direction will be closed for various improvements between Linton Boulevard and Atlantic Avenue (7 a.m. – 6 p.m., weekdays). Similar closures apply further south in Highland Beach, including Saturdays.
- S.R. 806/Atlantic Avenue Reconstruction: Multiple lane closures affect S.R. 7/U.S. 441 and Atlantic Avenue for widening and utility work. Sidewalk detours are in place for the northbound side between Atlantic and Saturnia Isles Boulevard. Nightly closures for force main and hydrant installation occur between U.S. 441 and Lyons Road.
- Maintenance Work: A single lane closure on westbound Atlantic Avenue at High Point Boulevard is set for Feb. 4-5 (9 a.m. – 4 p.m.). In Boca Raton, the westbound Spanish River Boulevard Bridge will have a right lane closure on Feb. 3.
Central Palm Beach County - Boynton Beach Boulevard Resurfacing: Nightly single lane closures (8 p.m. – 6 a.m.) between Orchid Grove Trail and Palm Isles Drive. Double lane closures on the eastbound side are scheduled for Feb. 2-6.
- Boynton Inlet Bridge: Intermittent lane and sidewalk closures occur from 9 a.m. to 4 p.m., Feb. 2-6, for bridge repairs.
- Lake Worth Beach & West Palm Beach: All lanes are open on U.S. 1 near Belvedere Road. However, S.R. A1A/South Ocean Boulevard will see flagging operations and nightly lane closures near Lake Avenue and Phipps Ocean Park through April 30.
- Mar-a-Lago Traffic Circle: A new traffic pattern is in effect at the S.R. A1A and Southern Boulevard intersection; vehicles entering the circle must yield to those already inside.
- Greenacres: Eastbound Lake Worth Road will have a lane closure for sidewalk repair on Feb. 3.
Northern Palm Beach County - U.S. 1 Roadway Improvements: Outside lane closures occur between 59th Street and Northlake Boulevard during the day (9 a.m. – 4 p.m.) and at night (9 p.m. – 7 a.m.). Several corner sidewalks are closed for construction.
- S.R. 710/Beeline Highway Reconstruction: Heavy impacts include inside lane closures in both directions between Northlake Boulevard and Blue Heron Boulevard. The northwest ramp to eastbound Northlake Boulevard is closed through Spring 2026.
- Earman River Bridge Replacement: Northbound U.S. 1 traffic has been shifted to the southbound bridge. The river channel is closed to mariners through Spring 2027.
- Alternate A1A (Palm Beach Gardens/Jupiter): Intermittent daytime lane and sidewalk closures (9 a.m. – 4 p.m.) and nightly left lane closures (8 p.m. – 6 a.m.) are scheduled through Feb. 6.
Western Palm Beach County - S.R. 80/Southern Boulevard & S.R. 7: Ramp improvements are set to begin in February; currently, no lane closures are reported for this project.
- Pahokee (S.R. 15/Main Street): Intermittent lane closures occur from 8 a.m. to 6 p.m., Feb. 2-6, between Annona Street and Conners Highway.
- U.S. 27 (EAA Reservoir Bridges): Northbound and southbound traffic is shifted east through Dec. 31. Intermittent lane closures may occur Feb. 2-6 for deliverables.
Florida’s Turnpike - Boynton Beach Boulevard Interchange: Construction continues through early 2026 with work occurring during both day and night hours.
- Beeline Highway Overpass: S.R. 91 (Turnpike) will have nightly lane closures in both directions near the Beeline Highway through February 2026.

