Delray beach

Delray Beach Bridge Fixed, Reopening After Several Months

Delray Beach Florida News Palm Beach County

Troubled Bridge Over Water Is Troubled No More.

Delray beach

BY: STAFF REPORT | BocaNewsNow.com

DELRAY BEACH, FL (BocaNewsNow.com) (Copyright © 2022 MetroDesk Media, LLC) — It wasn’t a bridge over troubled waters, but a troubled bridge over water. The George Bascule Bridge — closed for months — is reopening late Friday.

The City of Delray Beach just transmitted this advisory which we are passing on to our readers:

On Thursday, March 3, George Bush Bascule Bridge, which was built in 1949, experienced a significant malfunction during an opening. The spans were raised; however, they were unable to close, and remained in the open position. Maintenance staff was notified, responded, and worked through the night, determining the cause of the malfunction to be damage to the original machinery, more specifically, a main-shaft and gear section of the drive system.

All replacement components have been fabricated and installed. Three weeks of extensive testing and an inspection period followed while the mechanics of the bridge were continuously adjusted and fine-tuned.

The bridge has now been deemed safe and will re-open and be fully operational no later than 5 P.M. on Friday, April 29, 2022. Intermittent bridge closures are to be expected as continued monitoring is planned.

LOCAL JOURNALISM SUPPORTER.

Paul Saperstein

 

Content copyright © 2022 Metro Desk Media, LLC. All Rights Reserved. BocaNewsNow.com ® is a registered trademark of MetroDesk Media, LLC. For our intellectual property, terms, and conditions, read hereBroadcast stations must credit BocaNewsNow.com on air. Print must refer to BocaNewsNow.com. Online must link to BocaNewsNow.com. Contact news (at) bocanewsnow.com. Call 561-576-NEWS (6397). Arrest reports are police accusations. Guilt or innocence is determined in a court of law. 

Tagged