Road Closed

SLOW: Big Traffic Problems In Boca Raton, Delray Beach, Boynton Beach, Lake Worth Beach

Boca Raton Boynton Beach Delray Beach Florida Lake Worth Beach News Palm Beach County
Road Closed

BY: TRAFFIC CENTER | BocaNewsNow.com

DELRAY BEACH, FL (BocaNewsNow.com) (Copyright © 2024 MetroDesk Media, LLC) — Here’s the latest traffic update from the Florida Department of Transportation and Palm Beach County for traffic problems expected over the next several days:

SOUTHERN PALM BEACH COUNTY PROJECTS
(BOCA RATON, HIGHLAND BEACH, DELRAY BEACH)

Advanced Transportation Management System (ATMS) Project
Description: This 6-mile project from the Broward/Palm Beach County Line to SR 794/Yamato Road and SR 794/Yamato Road from SR 5/US 1 to SR 9/I-95 in the city of Boca Raton began on July 31, 2023. Work includes installing a new fiber optic network, Intelligent Transportation System (ITS) devices, including Closed-Circuit Television (CCTV) devices at eight (8) intersections on US 1 from Royal Palm Way to Spanish River Boulevard, upgrading the signal detection system, and upgrading the Advance Traffic Management System (ATMS) for compatibility with the Traffic Management Center (TMC). For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $3.6 million/Fall 2024.
Traffic Impacts:
No anticipated impacts.

SR 800/Spanish River Boulevard Over the Intracoastal Waterway (ICWW) Scour Countermeasures Project
Description: This 0.092-mile project on SR 800/Spanish River Boulevard over the Intracoastal Waterway (ICWW) in the City of Boca Raton began January 9, 2024. Work includes Installing Articulated Concrete Block (ACB) at the riverbed to protect the bridge foundations from erosion on the eastbound and westbound SR 800/Spanish River Boulevard bridges. For more information, please contact Community Outreach Manager Andrea Pacini at (561) 214-3358 or apacini@corradino.com.
Cost/Completion: $2.1 million. Completion is expected in Fall 2024.
Traffic Impacts:
The frontage road may have intermittent lane closures, daily as needed, 7 a.m. until 6 p.m., Monday through Friday, for survey activities. Flaggers will be on site to assist motorists.
Marine Impacts:
Crews may be on site performing underwater debris removal outside of the navigable channel. No impacts to boaters are anticipated with this activity.
Divers will be on site performing survey work beginning Wednesday, May 1; boaters, please use caution. No impact to the channel is anticipated with this activity.

SR A1A/South Ocean Boulevard Resurfacing Project
Description: This 3.349-mile project in the Town of Highland Beach and the City of Delray Beach is anticipated to begin in late May/early June 2024. The project improvements consist of milling and resurfacing the existing roadway, widening the roadway in each direction to provide five-foot bicycle lanes, modifying swales to improve drainage, and upgrading signing and pavement markings to meet current standards. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $ $8.3 million/Fall 2025
Traffic Impacts: All lanes are open.

CENTRAL PALM BEACH COUNTY PROJECTS
(Boynton Beach, Lake Worth Beach, Royal Palm Beach, West Palm Beach, Palm Beach)

City of Boynton Beach Sidewalk and Bicycle Lane Improvements Project
Description: This .62 miles on SR 804/Boynton Beach Boulevard and .7 miles on W Ocean Avenue in the City of Boynton Beach project is anticipated to begin on May 7, 2024. Work includes milling, resurfacing and reconstructing SR 804/Boynton Beach Boulevard within project limits, expanding the existing sidewalk on the south side of SR 804/Boynton Beach Boulevard to 15 feet and to 9 feet on the north side, performing drainage modifications to accommodate sidewalk expansion on SR 804/Boynton Beach Boulevard, retrofitting pedestrian lighting at signalized intersections on SR/804 Boynton Beach Boulevard, constructing a new pedestrian crossing at NW 3rd Street and SR 804/Boynton Beach Boulevard, installing shared lane bicycle markings (sharrows) in each direction of SR 804/Boynton Beach Boulevard and on West Ocean Avenue, and upgrading pedestrian signals, pavement markings, and signs. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $7.2 million/Fall 2025
Traffic Impacts: All lanes open.

SR 802/Lake Worth Road at Haverhill Road Intersection Improvement Project
Description: This 0.148-mile project from 500 feet east and west of the Haverhill Road intersection and along Haverhill Road from 300 feet south to 300 feet north of the SR 802/ Lake Worth Road intersection in the City of Greenacres began on February 6, 2024. Work includes milling and resurfacing the existing roadway, modifying the median to improve motorist safety, replacing the traffic signal mast arm structure located in the northeast corner of SR 802/Lake Worth Road and Haverhill Road, installing curb and gutter, sidewalk, driveways, and bus stop pads, improving pavement markings, signage, and signalization, upgrading pedestrian signals and curb ramps to meet Americans with Disabilities Act (ADA) standards. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $1.3 million/Summer 2024
Traffic Impacts:
One outside lane in each direction of SR 802/Lake Worth Road between Broward Avenue and Dahl Drive will be closed intermittently from 9 a.m. until 4 p.m., Monday through Friday, for minor widening, sidewalk, and signalization work through May 2024.
One outside lane in each direction of SR 802/Lake Worth Road at Haverhill Road will be closed intermittently from 9 a.m. until 3 p.m. for minor widening, sidewalk, and signalization work through May 2024.

SR 802/Lake Worth Road Improvements Project
Description: This 1.90-mile project from Raulerson Drive to Palm Beach State College Entrance/Douglas Drive in the city of Lake Worth Beach began on November 14, 2022. Work includes constructing a new exclusive right turn lane from eastbound Lake Worth Road into the Mid-County Senior Center, installing new seven-foot bike lanes with upgraded safety features, milling and resurfacing Lake Worth Road in both directions, replacing underground Palm Beach County utilities throughout the project limits, improving sidewalk and driveways on both sides of Lake Worth Road, modifying medians to improve motorist safety, improving signalized intersections and pedestrian crossings, and installing new signage, pavement markings, and lighting. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $14 million. Completion is expected in winter 2024.
Traffic Impacts:
Two eastbound lanes on Lake Worth Road from Raulerson Drive to Congress Avenue may be closed from 7 a.m. to 3:30 p.m., Monday through Friday, for force main construction, median construction, directional bore operations, and drainage work.
Two westbound lanes on Lake Worth Road from Congress Avenue to Raulerson Drive may be closed from 7 a.m. to 3:30 p.m., Monday through Friday, for force main construction, median construction, directional bore operations, and drainage work.
One lane in each direction on Lake Worth Road from Raulerson Drive to Douglas Drive may be closed for median construction and drainage operations.
The inside northbound left turn lane on Congress Avenue at Lake Worth Road is closed for median construction.

SR 802/Lake Worth Road Roundabout Pedestrian Safety Project on Behalf of the City of Lake Worth Beach
Description: This 0.5-mile project from Erie Street to A Street/Lucerne Avenue Roundabout and Lucerne Avenue to C Street, and Lake Osborne Drive from Griswold Drive to Erie Street in the City of Lake Worth Beach began on January 3, 2024. Work includes milling and resurfacing existing travel lanes, constructing a six-foot wide sidewalk along the east side of Lake Osborne Drive, installing a raised crosswalk with signalization on Lucerne Avenue just east of N B Street, upgrading pedestrian signals and curb ramps to meet Americans with Disabilities Act (ADA) standards, and upgrading lighting along Lake Worth Road. For more information, please contact Community Outreach Specialist Melissa Readling at mreadling@corradino.com or 772-577-8803.
Cost/Completion: $2.8 million/Summer 2024
Traffic Impact
One outside westbound lane of SR 802/Lake Worth Road between the railroad tracks and N. A Street may be closed from 9 a.m. until 2 p.m., Monday through Friday, for clearing and grubbing and concrete sidewalk work.
One outside eastbound lane of SR 802/Lake Worth Road between Cleveland Street to N. A Street may be closed from 9 a.m. until 2 p.m., Monday through Friday, for clearing and grubbing, concrete sidewalk work.

SR 802/Lake Avenue/Lucerne Avenue Resurfacing, Restoration, and Rehabilitation Project
Description: This 2.382-mile project from east of A Street to east of Golfview Road in the City of Lake Worth Beach began on February 27, 2024. Work includes milling and resurfacing the existing roadway, replacing and upgrading signing and pavement markings, install new and upgrade existing lighting throughout the project corridor, upgrading pedestrian features at signalized intersections, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards. For more information, please contact Community Outreach Specialist Melissa Readling at mreadling@corradino.com or 772-577-8803.
Cost/Completion: $5.4 million/Early 2025
Traffic Impacts:
Intermittent sidewalk closures will occur at the intersection of the south side of Lucerne Avenue and South C Street to south side of Golfview Road and Lucerne Avenue from 7 a.m. to 4 p.m., Monday through Friday, for removal of existing concrete and construction of new sidewalks, curbs, and gutters. Pedestrian detours will be in place and access to businesses will be maintained.
One lane in each direction will be closed intermittently on Lake Avenue from B Street to Golfview Road, from 9 p.m. to 7 a.m., Monday through Friday, for directional bores.

State Road (SR) 5/North Federal Highway Milling and Resurfacing Project
Description: This 1.298-mile project from south of 10th Avenue South to 6th Avenue North in Lake Worth Beach is anticipated to begin Late May/Early June. Project improvements include milling and resurfacing the existing roadway, adding drainage and constructing a raised intersection at 7th Avenue South, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards, installing signalized pedestrian crossings with Rectangular Rapid Flashing Beacons (RRFBs) at 8th Avenue South, 3rd Avenue North, and 4th Avenue North, removing the existing midblock crossing between 4th Avenue North and 5th Avenue North, upgrading vehicular and pedestrian signalization at 6th Avenue South and 2nd Avenue North, installing lighting at the intersections of 8th Avenue South, 6th Avenue South, 2nd Avenue North, 3rd Avenue North, and 4th Avenue North, and upgrading signage and pavement markings for shared bicycle facilities and buffered bicycle lanes. For more information, please contact Community Outreach Specialist Melissa Readling at (772) 577-8803 or mreadling@corradino.com.
Cost/Completion: $2.3 million. Completion is anticipated in spring 2025.
Traffic Impact: No impacts anticipated.

6th Avenue South Improvements at SR 9/I-95
Description: This 1-mile project in the City of Lake Worth Beach began on November 13, 2023. Project improvements consist of lengthening the turn lanes on 6th Avenue South, adding an exclusive right turn lane to the SR 9/I-95 northbound on ramp, adding an additional right turn lane to the SR 9/I-95 southbound on ramp, lengthening the northbound left turn lane at A Street, constructing 6-foot sidewalks on both sides of 6th Avenue South, constructing 7-foot bicycle lanes on both sides of 6th Avenue South, installing Wrong-Way Driving Countermeasures on the SR 9/I-95 northbound and southbound exit ramps, constructing 16-foot ground-mounted sound walls along the SR 9/I-95 northbound exit ramp and south side of 6th Avenue South, constructing new gravity wall, curb and gutter, traffic separator, median barrier, sidewalk and driveway along 6th Avenue South within project limits, upgrading drainage, signage, lighting, signalization and pavement markings, Intelligent Transportation System (ITS) upgrades, and relocation of water, sewer and utilities for the City of Lake Worth Beach.
Cost/Completion: The project cost is $17.92 million. Completion is expected in Late 2025. For more information, please contact Community Outreach Manager Andrea Pacini at (561) 214-3358 or apacini@corradino.com.
Traffic Impact:
6th Avenue South, from Michigan Avenue to South C Street, will have one lane closed in each direction through August 2024.
Ramp Impact:
The I-95 southbound entrance ramp from eastbound 6th Avenue South has the right turn lane closed to safely facilitate roadway and drainage operations.
The I-95 northbound exit ramp to eastbound 6th Avenue South has the right turn lane closed to safely facilitate roadway and drainage operations.
The I-95 northbound exit ramp to westbound 6th Avenue South has the left turn lane closed to safely facilitate roadway and drainage operations.
The I-95 southbound exit ramp to westbound 6th Avenue South has one right turn lane closed to safely facilitate the construction of a Mechanically Stabilized Earth (MSE) wall and roadway construction.

SR 7/US 441 Resurfacing Project
Description: This 2-mile project in Royal Palm Beach began on August 17, 2023. The project improvements consist of milling and resurfacing the existing roadway, improving signing and pavement markings, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards, and upgrading lighting and signalization at the following intersections: Weisman Way/Bella Terra Way, Belvedere Road, Business Park Way, Regal Cinemas 18, Aldi Way, and Okeechobee Boulevard. For more information, please contact Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $8 million/Fall 2024
Traffic Impacts:
Intermittent single-lane closures will occur in each direction of SR 7/US 441 from north of SR 80/Southern Boulevard to SR 704/Okeechobee Boulevard, from 8:30 a.m. until 4:30 p.m. Monday through Friday for installation of erosion control devices, sidewalk, bus pads, lighting, and signalization upgrades.

SR 809/Military Trail at SR 882/Forest Hill Boulevard Intersection Improvements Project
Description: This 0.705-mile intersection improvement project on State Road 809/Military Trail and SR 882/Forest Hill Boulevard in Palm Beach County began on September 6, 2022. Work includes widening, milling, and resurfacing along SR 809/Military Trail and SR 882/Forest Hill Boulevard, constructing additional right and left turn lanes on SR 809/Military Trail and additional right turn lanes on SR 882/Forest Hill Boulevard, installing new 5-foot bike lanes at various locations along SR 882/Forest Hill Boulevard, improving sidewalks and driveways at the intersection of SR 809/Military Trail and SR 882/Forest Hill Boulevard, installing four new signal mast arms at the intersection, and installing new signage and pavement markings. For more information, please contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com.
Cost/Completion: $7 million. Completion is expected in winter 2024.
Traffic Impact:.
The outside eastbound and westbound lanes on Forest Hill Boulevard may be closed from Haverhill Road to Kirk Road from 7 a.m. to 5 p.m. Monday through Friday for signalization work.
The outside northbound and southbound lanes on Military Trail may be closed from Summit Boulevard to Purdy Lane from 9 a.m. to 3 p.m. Monday through Friday, for signalization work.
The outside southbound lane on Military Trail from Hairland Drive to Forest Hill Boulevard is closed for turn lane construction, drainage and utility work.

State Road (SR) 5/US 1 Improvements Project
Description: This 0.437-mile road improvements project on SR 5/US 1 from North Quadrille Boulevard to Palm Beach Lakes Boulevard in the City of West Palm Beach began on Thursday, September 14, 2023. Work includes milling and resurfacing the existing roadway, improving curb and gutter, signing and pavement markings, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards, and upgrading pedestrian signalization. For more information, contact Community Outreach Specialist Melissa Readling at 772-577-8803 or mreadling@corradino.com
Cost/Completion: 1.2 million/Spring 2024
Traffic Impacts:
Lane closures may be in place from Quadrille Boulevard to Palm Beach Lakes Boulevard from 9 a.m. to 4 p.m., Monday through Tuesday to facilitate signalization work and utility adjustment work.

MAINTENANCE, UTILITY, PERMIT & ADDITIONAL AGENCY PROJECTS
SOUTHERN PALM BEACH COUNTY
(BOCA RATON, HIGHLAND BEACH, DELRAY BEACH)

BOCA RATON

Westbound Yamato Road between Broken Sound Boulevard Northwest and North Military Trail, in Boca Raton, 9 a.m. until 3:30 p.m., Monday through Friday, Wednesday, Apr. 03 through Friday, Jun. 28, 1 of 4 lanes closed, for asphalt repairs. For more information, please contact Marco Larriega 954-249-6701.

Westbound Yamato Road between Broken Sound Boulevard Northwest and North Military Trail, in Boca Raton, 9 a.m. until 3:30 p.m., Monday through Friday, Tuesday, Apr. 09 through Monday, May 06, 1 of 4 lanes closed, for directional boring and conduit installation. For more information, please contact Marco Larriega 954-249-6701.

Southbound State Road 7 between Winners Circle and Yamato Road, in Boca Raton, 9 a.m. until 3:30 p.m., Monday through Friday, Thursday, Apr. 11 through Tuesday, Jun. 11, 1 of 3 lanes closed, for pole replacement and handhole installation. For more information, please contact Kyle Aslop 336-719-4879.

Eastbound Glades Road at 6000 Glades Road, in Boca Raton, 9 am – 3:30 pm, Monday through Friday, Tuesday, Feb. 27 through Friday, May 17, 1 of 3 lane closed, for directional boring and conduits installations. For more information, please contact Antonio Seco 305-803-9769.

Southbound North Ocean Drive between Northeast Spanish River Boulevard and The Yacht and Club Racket Apt, in Boca Raton, 9 a.m. until 3:30 p.m., Monday through Friday, Friday, Dec. 01 extended through Monday, Jun. 03, 1 of 1 lanes closed as needed, for pole installation. For more information, please contact Cory Zartman 480-547-0294.

HIGHLAND BEACH

Northbound at 4318 South Ocean Boulevard, in Highland Beach, 9 a.m. until 3:30 p.m., Two days only, Wednesday, May 01 through Thursday, May 02, 1 of 1 lanes closed as needed, for gas line installation. For more information, please contact Zachary Gorman 561-531-2770.

DELRAY BEACH

Westbound West Atlantic Avenue just East of Half Mile Road, in Delray Road, 8 p.m. until 6 a.m., Sunday through Thursday, Tuesday, Apr. 23 through Wednesday, May 08, 1 of 2 lanes closed, for utility excavation. For more information, please contact Roosevelt Bynes III 954-321-8205.

Eastbound West Atlantic Avenue just East of Half Mile Road, in Delray Road, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Apr. 22 through Friday, May 10, 1 of 2 lanes closed, for drainage installation. For more information, please contact Roosevelt Bynes III 954-321-8205.

Eastbound West Atlantic Avenue between Southwest 5 Avenue and Southwest 2 Avenue, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Wednesday, Apr. 24 through Monday, Jun. 24, 1 of 2 lanes closed, for directional boring installation. For more information, please contact Kyle Aslop 336-719-4879.

Southbound North Federal Highway just 200’ ft North and 600’ ft South of 5150 North Federal Highway, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Apr. 22 through Friday, May 03, 1 of 2 lanes closed, for directional boring, conduit and fiber optic cable installation. For more information, please contact Eddy Perez 954-558-4290.

Eastbound West Atlantic Avenue at 152 Place South, in Delray Beach, 9 a.m. until 3 p.m., Monday through Friday, Friday, Mar. 01 through Friday, Oct. 11, 1 of 2 lanes closed, for entrance paving and guardrail installation. For more information, please contact Brett George 833-258-3631.

Westbound West Atlantic Avenue at intersection of Persimmon Avenue, in Delray Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Sept. 11 extended through Wednesday, May 17, 1 of 2 lanes closed, for water main connection. For more information, please contact Felix Clavelo 305-342-5568.

Westbound East Atlantic Avenue between Atlanticave Drawbridge and Southeast 7 Avenue, in Delray Beach, 8 a.m. until 3:30 p.m., Monday through Friday, Monday, Apr. 15 through Friday, Apr. 26, 1 of 2 lanes closed, for landscape removal and sidewalk installation. For more information, please contact Michael Heacock 863-617-5945.

Southbound North Ocean Boulevard between Thomas Street and East Atlantic Avenue, in Delray Beach, 7 p.m. until 6 a.m., Sunday through Thursday, Monday, Apr. 17 extended through Monday, May 06, 1 of 2 lane closed, for directional boring and facilities maintenance. For more information, please contact Arturo Rodriguez 561-475-0064.

Westbound and Eastbound Atlantic Avenue between Half Mile Road Persimmon Avenue additionally Northbound and Southbound Lyons Road, in Delray Beach, 8 a.m. until 5 p.m., Monday, Aug. 15 extended through Friday, Jul. 31, 2024, 1 of 2 lanes closed, for signalization, underground drainage and roadway. For more information, please contact Tom Castano 561-688-5004.

BOYNTON BEACH

Northbound and southbound Boynton Inlet Bridge, in Boynton Beach, 9 a.m. to 4 p.m., Tuesday, May 7 to Wednesday, May 8, intermittent single lane closures in each direction for bridge work. For more information, please contact Mark Donati 954-955-0878.

Southbound State Road 7 between Lake Royal Road and Maple Valley Road, in Boynton Beach, , 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Mar. 11 extended through Thursday, Jun. 13, 1 of 2 lanes closed, for pole replacement and facilities maintenance. For more information, please contact Cory Zartman 480-547-0294.

Eastbound Boynton Beach Boulevard just South of Congress Avenue, in Boynton Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Mar. 18 through Monday, Jul. 29, 1 of 3 lanes closed, for roadway and utility work. For more information, please contact Roosevelt Bynes III 954-321-8205.

Southbound State Road 7 at intersection of Boynton Beach Boulevard, in Boynton Beach, 7 am – 5 pm, Monday through Friday, Monday, Mar. 18 through Friday, May 03, 1 of 3 lane closed, for directional boring, water and fire mains installation. For more information, please contact Roger Mastrapa 954-644-3749.

Southbound State Road 7 between Boynton beach Boulevard and Atlantic Avenue, in Boynton Beach, 9 a.m. until 3:30 p.m., Monday through Friday, Thursday, Sept. 07 extended through Thursday, May 09, 1 of 2 lanes closed, handholes, concrete aprons, marker post, and boring pit installation. For more information, please contact Karl Suarez 336-719-4574.

Eastbound Boynton Beach Boulevard between Quail Covey Road and Leisureville Boulevard, in Boynton Beach, 9 a.m. until 4 p.m., Monday through Friday, Monday, Feb. 26 through Friday, Apr. 26, 1 of 3 lanes closed, for pole replacement. For more information, please contact Cory Zartman 480-547-0294.

Northbound Federal Highway between East Boynton Beach Boulevard and Murano Bay Drive, in Boynton Beach,7 pm – 6 am, Sunday through Thursday, Monday, Aug. 28 extended through Thursday, Apr. 29, 1 of 2 lane closed, for pole, handhole and maintenance installation. For more information, please contact Latess Hill 561-631-0663..

LAKE WORTH BEACH

Westbound and eastbound Lake Avenue ICW Bridge, in Lake Worth Beach, 9 a.m. to 4 p.m., Monday, May 6, intermittent single lane closure for bridge work. For more information, please contact Mark Donati 954-955-0878.

Northbound South Federal Highway at the intersection of Miner Road, in Lake Worth, 9 a.m. until 4 p.m., Monday through Friday, Thursday, Jan. 11 extended through Wednesday, May 08, 1 of 2 lanes closed, for directional boring and conduit installation. For more information, please contact Dennis Torrijos 954-235-3605.

Westbound and Eastbound Lake Worth Road between Cepheus Lane and Polo Road, in Lake Worth, 9 a.m. until 3:30 p.m., Monday through Friday, Wednesday, Apr. 10 through Friday, May 31, 1 of 3 lanes closed, for directional boring installation. For more information, please contact Lazaro Martinez 305-781-8906.

Northbound Federal Highway between 1 Avenue and Lucerne Avenue, in Lake Worth, 9 a.m. until 3:30 p.m., Monday through Friday, Monday, Mar. 18 through Monday, Apr. 29, 1 of 1 lanes closed, for concrete pole installation. For more information, please contact Urma Charlemagne 561-418-0598.

Sign Up For News Updates | Breaking News and Traffic Alerts

Our Featured Local Journalism Supporter:




Tagged

Leave a Reply

Your email address will not be published. Required fields are marked *