BOCA RATON, FL (BocaNewsNow.com) (Copyright © 2026 MetroDesk Media, LLC) — Here’s the latest traffic update:
As of 5 PM Thursday, May 7, 2026, Palm Beach County is seeing one active vehicle fire on I-95, congestion on Florida’s Turnpike in both directions, and multiple construction zones.
Active Incidents
- I-95 Northbound — Vehicle on fire before Exit 74 (CR-702/45th St.). 2 left lanes blocked. Started: 4:40 PM.
Congestion
- Florida’s Turnpike Southbound — Congestion from before Mile Marker 78 to Exit 75 (Glades Road/S.R. 808). Started: 4:08 PM.
- Florida’s Turnpike Northbound — Congestion from Exit 86 (Boynton Beach Blvd/S.R. 804) to before Mile Marker 89. Started: 3:10 PM.
Construction Zones
- I-95 NB — Ramp to Exit 79A (PGA Blvd E). Off-ramp right lane blocked.
- PGA Blvd EB — At Military Trail. Right lane blocked.
- Military Trail SB — At PGA Blvd. Left turn lane blocked.
- Boynton Beach Blvd WB — Before Jog Rd. Right lane blocked. (Major)
- US-441 NB — At Atlantic Ave. Right turn lane blocked.
- US-441 SB — At Atlantic Ave. Left turn lane blocked.
- Southern Blvd EB — At Pike Road. Right lane blocked.
- Southern Blvd WB — Before Florida Turnpike. Left lane blocked.
- SR 7 NB — At Southern Blvd. Right lane blocked.
- Okeechobee Blvd EB — At Vista Parkway. Left lane blocked.
- W Atlantic Ave EB — At US-441. Left lane blocked.
Data sourced from FL511.com.