BOCA RATON, FL (BocaNewsNow.com) (Copyright © 2026 MetroDesk Media, LLC) — Here’s the latest traffic update:
As of 7:03 AM on Tuesday, May 19, 2026, Palm Beach County roadways are showing light early-morning impacts. There is one active drawbridge closure on Royal Palm Way, minor congestion on southbound I-95 near Lantana, and seven ongoing construction zones with lane restrictions.
Active Incidents
- Royal Palm Way (both directions) at the Royal Palm Way bridge — bridge up, lanes closed. Reported at 6:59 AM.
Congestion
- I-95 Southbound from Exit 61 (CR-812 / Lantana Road) to Exit 60 (Hypoluxo Road) — minor traffic congestion. Reported at 6:58 AM.
Construction Zones
- US-441 Northbound at Atlantic Avenue — right turn lane blocked (planned construction; in effect since May 1).
- US-441 Southbound at Atlantic Avenue — left turn lane blocked (planned construction; in effect since May 1).
- Southern Boulevard Eastbound at Pike Road — right lane blocked (planned construction; in effect since May 1).
- Southern Boulevard Westbound before Florida’s Turnpike — left lane blocked (planned construction; in effect since May 1).
- SR 7 Northbound at Southern Boulevard — right lane blocked (planned construction; in effect since May 1).
- Okeechobee Boulevard Eastbound at Vista Parkway — left lane blocked (planned construction; in effect since May 1).
- Jog Road Northbound beyond Lake Worth Road — right lane blocked (major impact; in effect since May 12).
Data sourced from FL511.com.