BOCA RATON, FL (BocaNewsNow.com) (Copyright © 2026 MetroDesk Media, LLC) — Here’s the latest traffic update:
As of 12:02 PM on Monday, May 25, 2026, Palm Beach County roads are running mostly smoothly, with one area of minor congestion on I-95 and several ongoing construction zones affecting lane availability on major corridors. No active crashes are being reported by FL511 at this hour.
Congestion
- I-95 Northbound — From Exit 44 (CR-798 / Palmetto Park Road) to Exit 45 (SR-808 / Glades Road). Minor congestion. Reported at 11:31 AM.
Construction Zones
- Jog Road Northbound, beyond Lake Worth Road — right lane blocked. Severity: Major. Ongoing since May 12.
- US-441 Northbound, at Atlantic Avenue — right turn lane blocked. Ongoing since May 1.
- US-441 Southbound, at Atlantic Avenue — left turn lane blocked. Ongoing since May 1.
- Southern Boulevard Eastbound, at Pike Road — right lane blocked. Ongoing since May 1.
- Southern Boulevard Westbound, before Florida’s Turnpike — left lane blocked. Ongoing since May 1.
- SR-7 Northbound, at Southern Boulevard — right lane blocked. Ongoing since May 1.
- Okeechobee Boulevard Eastbound, at Vista Parkway — left lane blocked. Ongoing since May 1.
Data sourced from FL511.com.